Weird 2023 Taycan GTS dates on my TYD Portal...anyone else have this too?

Thread Tools
 
Search this Thread
 
Old 08-02-2022, 12:25 AM
  #1  
usctrojanGT3
Rennlist Member
Thread Starter
 
usctrojanGT3's Avatar
 
Join Date: Feb 2013
Posts: 16,289
Received 3,809 Likes on 2,171 Posts
Question Weird 2023 Taycan GTS dates on my TYD Portal...anyone else have this too?

So my 2023 Taycan GTS went into production on 7/26 with an estimated completion date and ready for transport of 8/26 (I thought the factor is closed in August for vacation?) and arrives at the Port of Emden on 9/2 so all cool there. Then this is where things get weird, it shows as the On Vessel date as 11/4 with a PEC LA delivery date of 12/9. The 5 weeks to from on the boat to PEC LA seems fine but my car is going to be sitting at the port for 2 months? Why, to get the EPA cert? Anyone else have this big 2+ month gap between arrival at Emden to getting on the boat?
Old 08-02-2022, 09:01 PM
  #2  
raffi
Pro
 
raffi's Avatar
 
Join Date: Apr 2003
Location: los angeles
Posts: 612
Likes: 0
Received 0 Likes on 0 Posts
Default

Never used Tyd before and not sure if it updates with actual dates after the build starts, but my freeze date was 7/29 and the eta shows 10/28. I was told I would have a December delivery so I figured the tyd dates were off.
Old 08-02-2022, 10:21 PM
  #3  
Pandaa
Advanced
 
Pandaa's Avatar
 
Join Date: Feb 2018
Posts: 59
Received 8 Likes on 7 Posts
Default

Originally Posted by usctrojanGT3
So my 2023 Taycan GTS went into production on 7/26 with an estimated completion date and ready for transport of 8/26 (I thought the factor is closed in August for vacation?) and arrives at the Port of Emden on 9/2 so all cool there. Then this is where things get weird, it shows as the On Vessel date as 11/4 with a PEC LA delivery date of 12/9. The 5 weeks to from on the boat to PEC LA seems fine but my car is going to be sitting at the port for 2 months? Why, to get the EPA cert? Anyone else have this big 2+ month gap between arrival at Emden to getting on the boat?
2023 EPA cert could be it. It did delay a few P cars last year. Local dealers had 10+ cars waiting for EPA and this was AUG2022.

Could always ask your SA to see if they have more info.
Old 08-02-2022, 11:26 PM
  #4  
nycebo
Three Wheelin'
 
nycebo's Avatar
 
Join Date: Oct 2005
Location: New York, NY
Posts: 1,806
Received 16 Likes on 10 Posts
Default

Doesn't Emden port still have a problem with the striking workers? The resulting backlog would must certainly lead to unexpected and lengthy delays.

As an aside, I can't believe you're getting a 2023 able the same time I'm to receive my 2022. Face palm.
Old 08-03-2022, 03:04 AM
  #5  
usctrojanGT3
Rennlist Member
Thread Starter
 
usctrojanGT3's Avatar
 
Join Date: Feb 2013
Posts: 16,289
Received 3,809 Likes on 2,171 Posts
Default

Originally Posted by nycebo
Doesn't Emden port still have a problem with the striking workers? The resulting backlog would must certainly lead to unexpected and lengthy delays.

As an aside, I can't believe you're getting a 2023 able the same time I'm to receive my 2022. Face palm.
We are in a weird time, it was looking like I was going to get my 2023 Taycan before my 2022 Touring arrived until the Touring got completed and the dates moved up.
Old 08-03-2022, 10:44 AM
  #6  
smohr33
Racer
 
smohr33's Avatar
 
Join Date: Mar 2008
Posts: 291
Received 150 Likes on 89 Posts
Default

Originally Posted by usctrojanGT3
We are in a weird time, it was looking like I was going to get my 2023 Taycan before my 2022 Touring arrived until the Touring got completed and the dates moved up.
Don't worry, I've got you all beat. I'm taking delivery of a new 2021 in a week or two (hopefully).

I only happened into it a couple months ago, but via TYD, this car has endured the most insane delays I've ever seen.
The following users liked this post:
Dr. G7 (08-03-2022)
Old 08-03-2022, 01:00 PM
  #7  
PDACPA
Instructor
 
PDACPA's Avatar
 
Join Date: Feb 2002
Location: Tampa, Florida
Posts: 128
Received 14 Likes on 7 Posts
Default

I was in the same position last year. It only takes a week to build the car and then 2 days to get to Emden. And yes they do shut the factory down for holiday and re-tooling for the new model year. Going from memory, but TYD used to update on Friday's. My TYD was accurate until it got to Emden and sat in Emden for a few weeks not getting on a ship when I knew others were getting loaded. Then it was accurate (plus Marine tracker to track the ship) all the way to to the port. Actually, I knew the ship had left Jax before TYD. Then it sat in Jax port with date to dealer changing to 3 weeks from original date.
Old 08-30-2022, 08:48 PM
  #8  
KoSoVaR
Rennlist Member
 
KoSoVaR's Avatar
 
Join Date: Jan 2022
Posts: 7
Likes: 0
Received 2 Likes on 2 Posts
Default

Originally Posted by usctrojanGT3
So my 2023 Taycan GTS went into production on 7/26 with an estimated completion date and ready for transport of 8/26 (I thought the factor is closed in August for vacation?) and arrives at the Port of Emden on 9/2 so all cool there. Then this is where things get weird, it shows as the On Vessel date as 11/4 with a PEC LA delivery date of 12/9. The 5 weeks to from on the boat to PEC LA seems fine but my car is going to be sitting at the port for 2 months? Why, to get the EPA cert? Anyone else have this big 2+ month gap between arrival at Emden to getting on the boat?
My 22 GTS ST original delivery date was 8/19. My new delivery date is 11/25. It’s been completed since 7/21. Stuck in TYD in “Ready to transport”. It’s supposed to get loaded on a boat 11/4 and be here 11/25.

So yea I think we’re in a similar boat.
The following users liked this post:
usctrojanGT3 (08-31-2022)
Old 08-30-2022, 11:28 PM
  #9  
CTB
Intermediate
 
CTB's Avatar
 
Join Date: Mar 2022
Location: New Jersey, USA
Posts: 46
Received 29 Likes on 19 Posts
Default

Originally Posted by KoSoVaR
My 22 GTS ST original delivery date was 8/19. My new delivery date is 11/25. It’s been completed since 7/21. Stuck in TYD in “Ready to transport”. It’s supposed to get loaded on a boat 11/4 and be here 11/25.

So yea I think we’re in a similar boat.
Similar situation and timing here: production completed 8/22, ready for transport 8/22 but doesn’t show in Emden yet. Scheduled to depart Emden 11/04 and arrive to dealer 11/25. My last Taycan also sat at Emden for 2 months between Jan-Mar 2022.

And yes, still a port worker strike impacting shipping, still a shortage of ships for transport, and also 12v battery supply impacting Taycan specifically.

Let’s hope they even stay on this schedule. Good luck to everyone waiting.
The following users liked this post:
usctrojanGT3 (08-31-2022)
Old 08-31-2022, 02:48 AM
  #10  
usctrojanGT3
Rennlist Member
Thread Starter
 
usctrojanGT3's Avatar
 
Join Date: Feb 2013
Posts: 16,289
Received 3,809 Likes on 2,171 Posts
Default

My completion date was 8/26 but then updated to 9/23 yesterday and the delivery date got pushed back a week.
Old 08-31-2022, 08:08 AM
  #11  
PierreTT
Rennlist Member
 
PierreTT's Avatar
 
Join Date: Jan 2006
Location: Quebec, Canada
Posts: 954
Received 161 Likes on 62 Posts
Default

Their internal systems are a mess according to my local SA.
My delivery date is now Nov 2nd but I hope to get it sooner as things started to move again (based on other recent deliveries). We'll see.

There was also a major strike in most of the german ports in August, messing up with an already messed up logistic
https://craneww.com/knowledge-center...trike-germany/

FWIW
Old 09-01-2022, 11:36 AM
  #12  
Dr. G7
Three Wheelin'
 
Dr. G7's Avatar
 
Join Date: Dec 2018
Posts: 1,548
Received 294 Likes on 240 Posts
Default

Originally Posted by usctrojanGT3
So my 2023 Taycan GTS went into production on 7/26 ...PEC LA delivery date of 12/9. ?
Worse, Find My Porsche will show available Taycans....and the dealer tells me be it will be 1/23 before the Taycan will be available.
Old 09-02-2022, 03:44 PM
  #13  
usctrojanGT3
Rennlist Member
Thread Starter
 
usctrojanGT3's Avatar
 
Join Date: Feb 2013
Posts: 16,289
Received 3,809 Likes on 2,171 Posts
Default

Originally Posted by PierreTT
Their internal systems are a mess according to my local SA.
My delivery date is now Nov 2nd but I hope to get it sooner as things started to move again (based on other recent deliveries). We'll see.

There was also a major strike in most of the german ports in August, messing up with an already messed up logistic
https://craneww.com/knowledge-center...trike-germany/

FWIW
My Taycan is now built and waiting for transport to the port and there it'll sit for 6 weeks until mid-Oct when it's supposed to get on a ship.
Old 09-02-2022, 07:28 PM
  #14  
PierreTT
Rennlist Member
 
PierreTT's Avatar
 
Join Date: Jan 2006
Location: Quebec, Canada
Posts: 954
Received 161 Likes on 62 Posts
Default

Originally Posted by usctrojanGT3
My Taycan is now built and waiting for transport to the port and there it'll sit for 6 weeks until mid-Oct when it's supposed to get on a ship.
Mine is still ¨In Production¨, since last week, witch make no sense... I think we are in the same batch so I'm hoping that mine is also waiting for transportation.
My SA has visibility in 2 different systems: One says Delivery October 7th, the other November 2nd
LOL Go Figure...
Old 09-02-2022, 10:21 PM
  #15  
usctrojanGT3
Rennlist Member
Thread Starter
 
usctrojanGT3's Avatar
 
Join Date: Feb 2013
Posts: 16,289
Received 3,809 Likes on 2,171 Posts
Default

Originally Posted by PierreTT
Mine is still ¨In Production¨, since last week, witch make no sense... I think we are in the same batch so I'm hoping that mine is also waiting for transportation.
My SA has visibility in 2 different systems: One says Delivery October 7th, the other November 2nd
LOL Go Figure...
That's interesting. Once my Taycan showed completed the delivery date to PEC LA moved from mid-Dec to late-Nov. Funny thing is my car is scheduled to sit at the port for 6 weeks waiting to board a ship for Houston in Mid-Oct. I'd like just like get the car before Christmas.


Quick Reply: Weird 2023 Taycan GTS dates on my TYD Portal...anyone else have this too?